• Costa Mesa

    Costa Mesa

    This project was approximately 165,000 sq. ft., 1.5:1 slope with a variety of failures. There was no access to...

  • La Habra – Landslide Repair

    La Habra – Landslide Repair

    A water district had a water main break causing a landslide on a residential property. D.P. Reynolds Corporation was...

  • Heisler Park Shotcrete Seawall

    Heisler Park Shotcrete Seawall

    D.P. Reynolds Corporation was contracted to repair an ocean front cliff where a 30 inch storm drain had failed....

  • Limited Access Slope Repair in Rancho San Clemente

    Limited Access Slope Repair in Rancho San Clemente

    The repair of the slope consisted of cutting an access road, establishing a keyway, installing sub drains and chimney drains and...