A water district had a water main break causing a landslide on a residential property. D.P. Reynolds Corporation was contracted to work with both parties to complete the slope restoration.

Both geogrid recompaction and pipe and board retention systems were utilized to achieve the original grade. We also installed a new area surface drainage system consisting of "V" ditches and collection basin.


Home | About Us | Services | Projects | Contact | Creek Bed | Heisler Park | La Habra | Residential
Copyright ©2009 DP Reynolds Corp.- All Rights Reserved