Creek Bed
Corona Del Mar creek bed restoration project.
The purpose of this restoration project was to re-establish the community beach access walkway, which had been destroyed by storm run off. More...
|
|
Residential
D.P. Reynolds Corp. was contracted to stabilize a large slope failure on a residential property. The plan was to remove the slide debris and overburden, drill a series of tie backs and construct a sculptured shotcrete retaining wall with planting pockets. More...
|
|
La Habra
The water district had a water main break causing a landslide on a residential property. D.P. Reynolds Corporation was contracted to work with both parties to complete the slope restoration. More...
|
|
Heisler Park
D.P. Reynolds Corporation was contracted to repair an ocean front cliff where a 30 inch storm drain had failed. Excavation and construction was dictated by the ocean's tides. More... |